The campus is in Hønefoss, which is close to Norway’s most densely populated city Oslo, as well as Norway’s largest international airport.

A total 200MW of IT load is planned across the entire campus. Three sites are under development with the first 6MW already live, an additional 12MW under construction and the rest in development. The site is perfectly situated in terms of power supply, infrastructure, and connectivity.

  • OSL1 Q2 2026
  • OSL2 Q2 2026
  • OSL3 Q4 2028

OSL1
Campus features

OSL1 is our first operational campus in Norway. We are planning to expand  with two additional sites, also situated in Hønefoss.

  • One building, two phases
  • 6MW live and occupied
  • 6MW under construction and available
  • PUE <1.2

 

  • AI racks readiness
  • Concurrently maintainable design
  • Strategically located in existing availability zone

Overview
OSL1

0

MVA POWER SECURED

0

MW LIVE

0

MW EXPANSION

0

RFS DATE

OSL2
Campus features

OSL2 is plot next to our first facility – located Hønefoss, close to Oslo and Norway’s largest international airport

  • One building, one data hall
  • 6MW of IT load,  2026 ready
  • Prefabricated modular building
  • Supporting area with security office, NoC, loading bay
  • Targeted annual PUE <1.2
  • N+1 electrical topology
  • N+2 free-cooling
  • Possibility for liquid cooling upgrade
  • Concurrently maintainable design
  • Next to our first site OSL1

Overview
OSL2

0

MVA POWER SECURED

0

MW IT PLANNED

0

READY

OSL3
Campus features

OSL3 is a continuation of our two campuses in Oslo, located in Hønefoss.

  • Site in development
  • Strategically located in existing availability zones
  • 120MW of IT load across 3 buildings
  • Targeted PUE 1.2
  • N+1 electrical topology
  • N+1 cooling topology
  • Dual-fed power targeted, power application underway
  • Rigorous cyber and physical security protocols including penetration tests and maturity assessments
  • Robust EHS program, including incident tracking, recording and reporting

Overview
OSL3

0

HA LAND SECURED

0

MW IT PLANNED

0

Q4 TARGET RFS DATE

About Norway

STRATEGIC LOCATION

Norway’s commitment to green technology aligns with the growing demand for environmentally responsible data operations.

LOW ENERGY COSTS

Abundant, cheap hydroelectric power and low electricity taxes make Norway cost-efficient for data centres.

SUSTAINABLE ENERGY

Norway is a global leader in renewable energy. Primarily powered by renewable sources: 98% hydropower with growing wind and emerging solar energy.

NATURAL COOLING

Norway’s cool climate reduces the need for artificial cooling, cutting operational costs.

STABLE BUSINESS ENVIRONMENT

Government incentives, political stability and energy surplus ensure predictable long-term costs.